COPN » Batching Cycles Login Site Map    Search 
CVHPA INC
 
 COPN
  
 batching cycles Minimize
The Certificate of Public Need (COPN) program is broken into batch cycles for different types of COPN projects. There are at least two batch cycles each year for each type of project. Batch cycles range from A through G and include all COPN reviewable projects. Click on the link below for a PDF detailing each batch cycle and the relevant COPN project review dates.
  
 Location: 1808 Coyote Drive
 Suite 100
 Chester, VA 23836
Phone: (804) 425-8867
Fax: (804) 425-8870
Email: info@cvhpa.org
Download Reader
Copyright © 2007 Central Virginia Health Planning Agency, Inc. All Rights Reserved
Terms of Use | Privacy Statement